NCT04886804

Beamion LUNG-1: A Study to Test Different Doses of Zongertinib in People With Different Types of Advanced Cancer (Solid Tumours With Changes in the HER2 Gene)

Boehringer Ingelheim · Phase 1 · RECRUITING

Enrollment
554
Study start
Jul 2, 2021
Primary completion
Feb 29, 2028
ESTIMATED

Registered primary endpoints

Phase Ia: Maximum Tolerated Dose (MTD)

Maximum tolerated dose is defined as the highest dose with less than 25% risk of the true Dose Limiting Toxicity (DLT) rate being equal to or above 33% during the MTD evaluation period in any studied regimen.

Time frame: At the end of Cycle 1 (each cycle is 21 days).

Phase Ia: Number of patients with Dose Limiting Toxicities (DLTs) in the MTD evaluation period

Time frame: At the end of Cycle 1 (each cycle is 21 days).

Phase Ib - Cohorts 1, 2, 3 (enrolled from CTP v8.0), and 5: Objective response (OR) as assessed by central independent review

OR is defined as best overall response of complete response (CR) or partial response (PR), where best overall response is determined according to Response Evaluation Criteria In Solid Tumors (RECIST) version 1.1, from the first treatment administration until the earliest of disease progression, death or last evaluable tumor assessment before start of subsequent anticancer therapy, loss to follow-up or withdrawal of consent.

Time frame: From the start of the trial treatment until end of month 12, up to 12 months.

Phase Ib - Cohorts 3 (patients prior to CTP v8.0), 6, 7, 8, and 9: Objective response according to RECIST 1.1 by investigator assessment

Clincal Trial Protocol version 8.0 = CTP v8.0

Time frame: From the start of the trial treatment until end of month 12, up to 12 months.

Phase Ib: Cohort 4: Objective response according to Response Assessment in Neuro-Oncology for Brain Metastases (RANO-BM) by central independent review

Time frame: From the start of the trial treatment until end of month 12, up to 12 months.

Linked assets

Original registry record

ClinicalTrials.gov · NCT04886804

Registry last update: Nov 12, 2026 · Retrieved Nov 24, 2026

Estimated completion dates are not confirmed results disclosure dates.