NCT05996003

NS-089/NCNP-02-201 in Boys With Duchenne Muscular Dystrophy (DMD)

NS Pharma, Inc. · Phase 2 · ACTIVE NOT RECRUITING

Enrollment
20
Study start
Feb 22, 2024
Primary completion
Feb 26, 2027
ESTIMATED

Registered primary endpoints

Adverse Event and Adverse Drug Reaction

Time frame: through study completion, up to follow-up phone call for Part 2

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Maximum plasma concentration (Cmax) of NS-089/NCNP-02

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Time of the maximum plasma concentration (Tmax) of NS-089/NCNP-02

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Terminal half-life (T1/2) of NS-089/NCNP-02

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Area under the concentration-time curve from time 0 to the last time point (AUC0-t) of NS-089/NCNP-02

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Area under the concentration-time curve from time 0 to infinity (AUC0-∞) of NS-089/NCNP-02

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Total body clearance (CLtot) of NS-089/NCNP-02

Plasma pharmacokinetic (PK) parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] The volume in the terminal state (Vz) of NS-089/NCNP-02

Urine pharmacokinetic parameters

Time frame: Day1, Week4 for each dose for Part 1, Day1 and Week24 for Part 2] Urinary excretion of NS-089/NCNP-02

Change from baseline in skeletal muscle dystrophin protein by immunoblot (Western blot).

Time frame: Baseline, Week25

Linked assets

Original registry record

ClinicalTrials.gov · NCT05996003

Registry last update: Sep 15, 2026 · Retrieved Nov 24, 2026

Estimated completion dates are not confirmed results disclosure dates.