NCT06427941

A Phase 1/2 Study of BGB-B2033, Alone or in Combination With Tislelizumab With or Without Bevacizumab, in Participants With Advanced or Metastatic Solid Tumors

BeOne Medicines · Phase 1 / Phase 2 · RECRUITING

Enrollment
630
Study start
Jul 23, 2024
Primary completion
Mar 31, 2027
ESTIMATED

Registered primary endpoints

Part A and B: Number of Participants with Adverse Events (AEs) and Serious Adverse Events (SAEs)

Number of participants with AEs and SAEs characterized by type, frequency, severity (as graded by the National Cancer Institute- Common Terminology Criteria for Adverse Events Version 5.0 \[NCI-CTCAE v 5.0/American Society for Transplantation and Cellular Therapy \[ASTCT\] for cytokine release syndrome \[CRS\] and immune effector cell-associated neurotoxicity syndrome \[ICANS\]), timing, seriousness, and relationship to study therapy; assessment of adverse events meeting protocol-defined dose-limiting toxicity (DLT) criteria

Time frame: Up to approximately 2 years

Part A and B: Maximum Tolerated Dose (MTD) or Maximum Administered Dose (MAD) of BGB-B2033

The MTD or MAD is defined as the highest dose that is tolerable or the highest dose administered, respectively.

Time frame: Up to approximately 2 years

Part A and B: Recommended Phase 2 dose (RP2D) of BGB-B2033

The RP2D(s) will be determined based on a biologically effective dose by taking the totality of available preclinical and clinical data, including safety, tolerability, pharmacokinetics (PK), pharmacodynamics, and antitumor activity, into consideration

Time frame: Up to approximately 2 years

Parts C, D, and E: Overall Response Rate (ORR) as assessed by the Independent Review Committee (IRC)

ORR is defined as the percentage of participants with best overall response (BOR) of complete response (CR) or partial response (PR) using Response Evaluations Criteria in Solid Tumors Version 1.1 (RECIST v1.1).

Time frame: Up to approximately 2 years

Linked assets

Original registry record

ClinicalTrials.gov · NCT06427941

Registry last update: Sep 16, 2026 · Retrieved Nov 24, 2026

Estimated completion dates are not confirmed results disclosure dates.